Chilled Water Piping - メーカー・企業と製品の一覧

Chilled Water Pipingの製品一覧

1~1 件を表示 / 全 1 件

表示件数

Certain food factory air conditioning chilled water piping

Effect verification of red rust turning into black rust.

This factory has been in operation for 15 years, and there are significant concerns about corrosion within the piping. As a countermeasure, we installed the "NMR Pipe Protector." After installation, there have been no occurrences of leaks, and the mass spectrometry results of the black rust within the rust indicated that the progression of red rust has been prevented, confirming the rehabilitation of the piping due to the formation of black rust. The amount of black rust within the rust increased from 1.2% before installation to 76.8% after 12 months, and to 90.2% after 23 months, proving the blackening of red rust. If we continue to use the "NMR Pipe Protector" in the future, piping replacement will not be necessary as long as external corrosion does not occur.

  • Water Treatment Plant

ブックマークに追加いたしました

ブックマーク一覧

ブックマークを削除いたしました

ブックマーク一覧

これ以上ブックマークできません

会員登録すると、ブックマークできる件数が増えて、ラベルをつけて整理することもできます

無料会員登録